Most plants have a speed, a rate or a yield that everyone treats as the ceiling. We train continuous improvement teams to test those limits, take the "impossible" ones apart, and recover capacity the plant has already paid for.
Somewhere, a team tried to run faster and hit a defect. The obvious fixes did not work, so the speed they could reach became "the maximum."
Nobody is lying and nobody is hiding anything. The number simply stopped being a hypothesis and started being a fact, because it then spread into the systems the plant runs on.
Zero Loss Analysis starts by asking whether a limit is real. Variance Tree Analysis, one of its tools, breaks the problem into the factors that physically control it, measures each one, and isolates the cause.
Fig. 3 · Generic example. Factor names are placeholders.
Separate the limits that have been tested from the ones that were inherited, and know which to reopen first.
Measure the line against what the equipment can do, not only against the standard.
Decompose a hard problem into measurable factors, test each one, and drill down to a cause you can act on.
Reset standards, report the gap as well as the score, and bring the result into capital planning.
Format, dates and group size are agreed on a call, so the training fits your site and your constraint.
Think of the one speed, rate or yield limit at your bottleneck that everyone accepts. Answer about that limit. Nothing is sent or stored.
Bring your hardest limit. This goes directly to me, and I read every message. Tell me whether you're interested in training for your team, the white paper, or both.
Thank you. I'll reply personally. In the meantime, feel free to connect with me on LinkedIn.
Numbers on this page are illustrative and not drawn from any plant.